Pacific Beach Pipeline

Pacific Beach Pipeline work at night

Projects Pacific Beach Pipeline Pacific Beach Pipeline City of San Diego Pacific Beach, Mission Beach, Midway District and Middletown, San Diego, CA $41,163,000 2022 Description The underground portion of the Pacific Beach Pipeline consisted of replacing 33,500 linear feet of 12 through 24 inch water mains. These water mains had been in service from the […]

San Marcos Interceptor Gravity Sewer

San Marcos Interceptor Gravity Sewer workers placing a large steel drilling casing in deep bore pit

Projects San Marcos Interceptor Gravity Sewer San Marcos Interceptor Gravity Sewer Vallecitos Water District San Marcos Blvd, San Marcos, CA $6,658,000 2022 Description The San Marcos Interceptor Sewer project replaced the Vallecitos Water District’s 1960’s era, 21 inch diameter, sewer interceptor with 42 inch fiberglass reinforced pipe trunk sewer main. In this phase, 3600 linear […]

Navajo Pump Station

16011 Navajo Pump Station interior of pump station showing large pumps and pipe connections

Projects Navajo Pump Station Navajo Pump Station City of San Diego City of San Diego $10,815,964.24 2022 Description The Navajo Pump Station is nestled within a residential area of the City of San Diego. Design concepts of the site required the station to blend in with the local community, while providing a new, state of […]

Villa La Jolla Drive

Villa La Jolla Drive 180" Storm Drain Emergency Improvements - workers inside drain pipe

Projects Villa La Jolla Drive 180″ Storm Drain Emergency Improvements Villa La Jolla Drive 180″ Storm Drain Emergency Improvements City of San Diego La Jolla, CA $2,560,000 2022 Description TC Construction was selected from the City of San Diego emergency services list to perform repairs to a failed 180 inch CMP storm drain. The failure […]

Oceanside Pump Station Relocation

Oceanside Sewer Lift Station overhead view if project site

Projects Oceanside Sewer Lift Station Oceanside Sewer Lift Station City of Oceanside City of Oceanside $11,533,418.00 2023 Description The City of Oceanside had an existing sewer lift station that was built in the 1960’s and had reached the end of its useful life. The project required the construction of an entirely new site approximately two […]

Pure Water Oceanside Conveyance & Injection Well Facilities

Pure Water Oceanside Conveyance & Injection Well Facilities interior image of worker with pipes

Projects Pure Water Oceanside Conveyance & Injection Well Facilities Pure Water Oceanside Conveyance & Injection Well Facilities City of Oceanside City of Oceanside $8,400,000 2023 Description This project tackled an intricate piece of the Pure Water project for the City of Oceanside. It delivered pure water from the Advanced Water Purification Facility (AWPF) to injection […]

Ocean Beach Pier Emergency Repair

Ocean Beach Pier Emergency Repair view east

Projects Ocean Beach Pier Emergency Repair Ocean Beach Pier Emergency Repair City of San Diego Ocean Beach, CA $815,000 2022 Description This project consisted of the design and structural repair of two damaged piles of the Ocean Beach Pier. The piles were affected by a significant wave event during an extreme high tide occurring on […]

Agua Hedionda Lift Station

21002 Agua Hedionda Lift Station aerial photo of pump station

Projects Agua Hedionda Lift Station Agua Hedionda Lift Station City of Vista/Carlsbad Cannon Road & 5 Freeway $6,368,996 2023 Description The Agua Hedionda Lift Station (AHLS) is a large, complex, pumping plant. It conveys raw wastewater from the cities of Vista and Carlsbad to the Encina Water Pollution Control Facility (WPCF) via a gravity trunk […]