MACC Task Order No 1 AC Water & Sewer Group 949 and 946
Projects MACC Task Order No 1 AC Water & Sewer Group 949 and 946 MACC Task Order No 1 AC Water & Sewer Group 949 and 946 City of San Diego San Diego $9,230,094 2018 Description This was the first Task Order project awarded under the City of San Diego’s newly piloted MACC (Multiple Award […]
HARRF Pump Station
Projects HARRF Pump Station (Hale Avenue Resource Recovery Facility) HARRF Pump Station (Hale Avenue Resource Recovery Facility) City of Escondido Escondido, CA $10,174,213 2016 Description TC Construction was contracted by the City of Escondido to demolish several existing facilities and make improvements to their HARRF treatment plant. Main items included in the project were: Demolition […]
One Paseo 33A
Projects One Paseo 33A One Paseo 33A Whiting Turner Co. Del Mar Heights Rd San Diego, CA $4,464,855 2019 Description One Paseo is a mixed use development located on a 23 acre parcel in Del Mar, CA. The development include retail shops, restaurants, offices and luxury apartments. Contracted through the Whiting Turner Company, TC Construction […]
Castlerock Wet Utilities
Projects Castlerock Wet Utilities Castlerock Wet Utilities Pardee Homes Mast Blvd/Medina Drive Santee CA 92071 $10,426,770 2018 Description The Castlerock development is located on the north side of Mast Blvd in Santee. Although the City of Santee and Padre Dam water are involved in the inspection process, ultimately the City of San Diego will be […]
Black Mountain Ranch Unit 14 Improvements
Projects Black Mountain Ranch Unit 14 Improvements Black Mountain Ranch Unit 14 Improvements Black Mountain Ranch LLC San Diego, 2 Miles East of Rancho Santa Fe $8,912,042 2018 Description Located among rolling hills just east of Rancho Santa Fe, this project included nearly 300 residences. TC Construction was contracted by Black Mountain Ranch LLC., to […]
Woodside Avenue Flood Control
Projects Woodside Flood Control Woodside Ave Flood Control Improvements County of San Diego Lakeside, CA $17,160,000 2017 Description Woodside Ave project consisted of constructing a large box culvert to eliminate historical flooding of the Riverview area in Lakeside, CA. The Riverview area includes light commercial, offices, apartments, and a school zone. The box culvert was […]
Sycamore Ranch
Projects Sycamore Ranch Sycamore Ranch William Lyons Homes Fallbrook, CA $3,050,000 2017 Description The County of San Diego required several road improvements before a new housing development could be deemed complete. Two dead end roads had to be improved and connected over an existing river channel. The project involved the following improvements: Clearing and grubbing […]
Sorrento Mesa Recycled Water Pipeline
Projects Sorrento Mesa Recycled Water Pipeline MACC Task Order No 15 Sorrento Mesa Recycled Water Pipeline City of San Diego Sorrento Mesa $2,245,419.00 2017 Description This project was awarded under the City of San Diego’s MACC (Multiple Award Construction Contract) program. TC Construction was selected from a pre-qualified group of five short-listed contractors to design […]
Harmony Grove Village Storm Drain
Projects Harmony Grove Village Storm Drain Ph 1 Harmony Grove Village Storm Drain Ph 1 CalAtlantic Group Harmony Grove Road, Escondido $10,826,832 2017 Description Harmony Grove Village is a 740 home development on a 460 acre site in rural Escondido, CA. Approximately 45,000 linear feet of 6 to 96 inch storm drain pipe and 540 […]
Sewer & Water Group 957
Projects Sewer & Water Group 957 Sewer & Water Group 957 City of San Diego Downtown San Diego $3,546,491 2016 Description This was a Design-Bid-Build project for the City of San Diego. The work consisted of: Removal and replacement of 8,200 feet of 8 to 20 inch water mains Fire hydrants and services, water services, […]