Woodside Ave project consisted of constructing a large box culvert to eliminate historical flooding of the Riverview area in Lakeside, CA. The Riverview area includes light commercial, office, apartments, and a school zone. The box culvert was 2,600lf in length x 5.5 lf height x 34 lf width, and required extensive shoring, traffic control, staging and box jacking under a freeway. Preceding the box culvert, major utilities were relocated, including overhead power and communications, sewer, and 4 water transmission mains. All these utilities required relocation to accommodate the box culvert which would cross over the main street. All utilities required extensive shoring, traffic control, phasing, unforeseen soils conditions, and construction changes. Because the water mains were so large (36 in, 48 in, 72 in welded steel pipe), extensive tie-ins and 24 hr operations were required. Following completion of the underground infrastructure, most of the road was reconstructed and widened.
Corporate Office
10540 Prospect Avenue
Santee, CA 92071
Phone 619.448.4560
General Fax 619.258.9751
Estimating Fax 619.448.3341
© 2023 TC Construction Co.
Privacy
Terms of use