La Media Road Improvements
![La Media Road Improvements](https://tcincsd.com/wp-content/uploads/2023/12/23013_prg_Sheldon_drone_0011-1024x768.jpg)
Projects La Media Road Improvements La Media Road Improvements City of San Diego Otay Mesa, San Diego $42,884,662 In Progress Description The La Media Road Improvements Project will enhance safety, provide congestion relief, and a much needed, improved access road for freight trucks to Otay Mesa Port of Entry. The scope of the project includes: […]
Merge 56
![Merge 56 overhead view of stormwater system installation](https://tcincsd.com/wp-content/uploads/2023/11/20007_210414_prg_026-1024x682.jpg)
City of San Diego
Woodside Avenue Flood Control
![Woodside Avenue Flood Control project puring concrete](https://tcincsd.com/wp-content/uploads/2023/11/15004_150826_prg_006-1-1024x683.jpg)
Projects Woodside Flood Control Woodside Ave Flood Control Improvements County of San Diego Lakeside, CA $17,160,000 2017 Description Woodside Ave project consisted of constructing a large box culvert to eliminate historical flooding of the Riverview area in Lakeside, CA. The Riverview area includes light commercial, offices, apartments, and a school zone. The box culvert was […]
Harmony Grove Village Storm Drain
![Harmony Grove Village drainage box culverts being placed](https://tcincsd.com/wp-content/uploads/2023/11/12020_130808_prg_003-1024x683.jpg)
Projects Harmony Grove Village Storm Drain Ph 1 Harmony Grove Village Storm Drain Ph 1 CalAtlantic Group Harmony Grove Road, Escondido $10,826,832 2017 Description Harmony Grove Village is a 740 home development on a 460 acre site in rural Escondido, CA. Approximately 45,000 linear feet of 6 to 96 inch storm drain pipe and 540 […]