TC Construction was awarded this contract through the pre-qualified contractor emergency services list. TC Construction used a continuous run of 18 inch fused HDPE, to slipline 1,320 linear feet of damaged and leaking 20 inch CML&C pipe that was attached to the side of the West Mission Bay Bridge. Work was performed over the waterway and in environmentally sensitive conditions.