Description
TC Construction was contracted by the City of Escondido to demolish several existing facilities and make improvements to their HARRF treatment plant. Main items included in the project were:
Demolition of existing buildings and installation of new sludge drying pits
Retrofit of existing head works facility with new bar screen ladder system
New 500 gallon polyethylene chemical storage tank and injection facility
New 2500 CFM odor control system and associated piping
Installation of various mechanical piping and valves throughout the WWTP
Retrofit equipment anchoring systems for earthquake protection
Remove and replace 640 linear feet of existing gravity sewer main with new 26 inch HDPE
2.5 MGD sewer bypassing
Installation of 440 linear feet of new 24 inch, above grade, steel pipeline and connections
Demolition of existing pumps and piping in the pump station
Installation of 6 new vertical turbine sewage pumps
Reroute of new 8 inch PW and 12 inch RW water lines
Construction of new screenings building
New electrical and control infrastructure for added functionality throughout the site
Awards
CWEA.org (California Water Environment Assoc) Year 2021-2022 won award for Plant of the Year Medium