This project was implemented to blend treated water from the Poseidon Desalination Plant through a 54 inch pipeline into a 96 inch San Diego County Water Authority potable water transmission main. The work consisted of designing and constructing a water tight, reinforced concrete weir structure around the existing 96 inch CML&C transmission main. The new 15 feet tall weir wall needed to be capable of handling flows of 450 CFS, required two 54 inch CML&C pipeline interconnects, and a 54 inch butterfly valve installation. Continuous work was necessary 24/7 for nearly 3 months to meet a strict shutdown schedule deadline. Other challenging aspects included noise monitoring and mitigation, extensive rock breaking, limited access, shoring, and earthwork.
Phone 619.448.4560
General Fax 619.258.9751
Corporate Office
10540 Prospect Avenue
Santee, CA 92071
Phone 619.448.4560
General Fax 619.258.9751
Estimating Fax 619.448.3341
General Engineering Contractor
California License No. 402459
Class A and C-21
© TC Construction Co., Inc.
All Rights Reserved.
Privacy | Terms of use