2011 Collector Street Resurfacing Project

FY'12 Asphalt Overlay Group 1

Mission Bay Parking Lots - Phase II Design Build

 
 
 

FY'12 Asphalt Overlay Group 1

Contracted By   City of San Diego
Public Project
Dates Work was Performed  April 2012 - March 2013
Location City of San Diego
Scope of Work

  • Cold milling
  • Placement of asphalt concrete
  • Pavement base repairs
  • Installation of curb ramps to meet ADA compliance
  • Adjustment of City of San Diego manholes and gate valves
  • Replace traffic signal detector loops and stub-outs
  • Tree trimming
  • Street sweeping
  • Traffic striping, markings and legends
  • Traffic control

Unique Aspects

  • Working on approximately 80 different streets within the City of San Diego, from Lake Hodges to San Ysidro