Aqua Hedionda Lift Station Temporary Emergency Bypass Pumps Design Build

San Marcos Vent Desal Modification

Camp Pendleton

Poggi Canyon

 
 
 
 

Aqua Hedionda Lift Station Temporary Emergency Bypass Pumps Design Build

Contracted By   City of Vista
Public Project   
Dates Work Performed   April 2014 - October 2014
Location   Carlsbad, California

Scope of Work

  • Design and construct cast in place pump suction vault
  • Install two 600HP Flex Tier 3 diesel sewer bypass pumps,
    22 million gallons per day per pump cacacity
  • Wet well
  • Suction and discharge piping

Unique Aspects

  • Directy adjacent to the Pacific Ocean and NCTD railway tracks
  • Very small site with limited access