DESIGN BUILD

Aqua Hedionda Lift Station Temporary Emergency Bypass Pumps Design Build

San Marcos Vent Desal Modification

Camp Pendleton

Poggi Canyon

 
 
 

San Marcos Vent Desal Modification

Contracted By   San Diego County Water Authority
Public Project   
Dates Work Performed   January 2014 - May 2014
Location   San Marcos, California

Scope of Work

  • Design and construct a buried Cast In Place, 25' x 25' Weir structure
  • Valve vault around San Diego County Water Authority's 96" P4 pipeline

Unique Aspects

  • Design Build
  • Excavating solid rock
  • Working and shoring around a live 96" steel pipe